Current and planned temporary road closures

There are a variety of reasons why a road may need to be closed. This may include safety measures during roadworks, building repairs to a property or holding a community event. Whatever the reason, the road closure requires a legal order or notice and the procedures and requirements for closing a road must be strictly adhered to.

Below are current and planned temporary road closures for the week ahead. This list will be updated at the end of each week  *** Unplanned closures may not appear on the list straight away due to the nature of how we are informed of these ***

If you require any further information regarding a planned or unplanned closure please contact us at Network.Management@doncaster.gov.uk

Further information and details of diversion routes including other road works can also be found at https://one.network/tm

Street Locality Status Start Date End Date Activity Reference Description
Askern Road Back Road TOLL BAR Proposed 27/10/2025 31/10/2025 QB20070359734-NR 2.7M Deep Dig - Full Collapsed Sewer
Avenue Road INSTONEVILLE In Progress 21/10/2025 27/10/2025 QA202I701729AA Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Low Voltage Mains Cable Fault.
Bank Street MEXBOROUGH In Progress 04/08/2025 11/02/2026 DQ020MEXPR-0005A Public Realm works
Bar Croft Lane MOSS Proposed 27/10/2025 31/10/2025 DQ015S292 MAKE SAFE TO LARGE DEPRESSIONS IN 2X AREAS UPTO 150MM LEVEL DIFFERANCE IN CWAY REQUIRES AROUND 20 TON OF TARMAC MATERIALS. ANY PROBLEMS SEE PHIL  W3W.....CIVIL-SEDATIVE-REKINDLE
Bawtry Road TICKHILL Proposed 07/11/2025 01/12/2025 DQ015S308 A631 BAWTRY ROAD / TICKHILL ROAD - ROAD SAFETY SCHEME
Campsall Hall Road CAMPSALL Proposed 03/11/2025 05/11/2025 BC008OGEA17875749SB To provide a safe working area for engineers to excavate and provide new ducting in  carriageway, to provide service to customer.
Cedar Road THORNE Proposed 03/11/2025 07/11/2025 DQ015S293 CARRIAGEWAY RESURFACING - CEDAR ROAD, THORNE. IN CONJUNCTION WITH HOLLY ROAD, THORNE
Churchill Road WHEATLEY In Progress 20/10/2025 27/10/2025 DQ00256/24-25 Electric connection for Premier Park Wheatley Ltd
Churchill Road WHEATLEY Proposed 04/11/2025 13/11/2025 DQ00220/25-26 Foul sewer connection for Premier Park Wheatley Limited
Common Lane CLIFTON Proposed 29/10/2025 29/10/2025 QB080290298250020 Excavate to locate service, check flow & pressure
Cow House Lane ARMTHORPE Proposed 03/11/2025 14/11/2025 LB7012104-000014107776A * *CIVILS EXCAVATION REQUIRED TO REPAIR DAMAGED PIPE- 3M
Garden Lane CADEBY Proposed 02/11/2025 02/11/2025 DQ015S329 PRE SURFACE DRESSING PATCHING AS MARKED ON SITE AND AS PER DIM SHEET. TOTAL SINGLE COAT WORK = 204 SQ.MTRS OVER 18 PATCHES ROAD CLOSURE
Gate House Lane AUCKLEY Proposed 05/11/2025 06/11/2025 KL665NWR25-232-ECML On track plant to consolidate ballast to improve track quality. Working times 22:50 - 05:20
Hall Street BARNBURGH Proposed 05/11/2025 06/11/2025 QB080285990980110 DF06 Highways defect to rectify the reinstatment
Holly Road THORNE Proposed 03/11/2025 07/11/2025 DQ015S294 CARRIAGEWAY RESURFACING - HOLLY ROAD, THORNE. IN CONJUNCTION WITH CEDAR ROAD, THORNE.
Ings Road BENTLEY Proposed 26/10/2025 26/10/2025 KL665NWR25-210-ECML Renew 2X 45ft rails. Pedestrian Marshalling in operation. Working times 00:01 - 08:00
Ings Road Ru562 BENTLEY Proposed 26/10/2025 26/10/2025 KL665NWR25-210-ECMLA Renew 2X 45ft rails. Pedestrian Marshalling in operation. Working times 00:01 - 08:00
Joan Croft Lane HOLME In Progress 18/10/2025 26/10/2025 KL660THORPELX-181025 Decommissioning the existing level crossing infrastructure, upgrading and commissioning a new Automatic Half Barrier crossing, to improve safety. Hours of work 20:00 - 10:00 daily.
Lords Head Lane WARMSWORTH In Progress 21/03/2025 19/12/2025 DQ02028006 HEAVY DUTY HGV WAGONS RUNNING THROUGHOUT THE DAY IMPORTING SPOIL TO THE GLEESON HOMES  RESIDENTIAL DEVELOPMENT.
Moss Road MOSS Proposed 27/10/2025 07/11/2025 DQ015S295 MOSS ROAD, MOSS - SITE INVESTIGATION WORKS CARRIED OUT BY SPL.
Ramsden Road HEXTHORPE Proposed 20/10/2025 24/10/2025 DQ02027846 S278 WORKS: Plane off and relay wearing course to Road
Selby Road WHEATLEY In Progress 24/10/2025 30/10/2025 QA202251017001592 · Excavate footway to locate cable fault, test faulted cable section and repair by joining in new cable and reinstate excavation plf.
Station Road FINNINGLEY Proposed 06/11/2025 07/11/2025 KL665NWR25-231-ECML On track plant to consolidate ballast to improve track quality. Working times 22:50 - 05:20
Tait Avenue EDLINGTON In Progress 24/10/2025 30/10/2025 QB080291106110040 Renew leaking water supply pipe
Tennyson Avenue MEXBOROUGH Proposed 20/10/2025 24/10/2025 DQ015S281 CARRIAGEWAY RESURFACING - TENNYSON AVENUE, MEXBOROUGH
Tickhill Road BAWTRY Proposed 07/11/2025 01/12/2025 DQ015S309 A631 BAWTRY ROAD / TICKHILL ROAD - ROAD SAFETY SCHEME
Ullswater Road To Coniston Road Service Road For Grasmere Close Hollingworth Close Coniston Court MEXBOROUGH Proposed 27/10/2025 31/10/2025 AZ7021001451604 LAY A NEW GAS SERVICE 8M FROM THE MAIN IN THE FOOTWAY AND CARRIAGEWAY
Wembley Road MOORENDS In Progress 15/09/2025 18/12/2025 DQ015S247 MARSHLAND ROAD / WEMBLEY ROAD - JUNCTION IMPROVEMENT
Wike Gate Road THORNE Proposed 05/11/2025 05/11/2025 QB20070255650-NR Replace MH Frame and cover due to loose and rocking manhole causing noise pollution
Wrancarr Lane MOSS Proposed 27/10/2025 31/10/2025 DQ015S291 MAKE SAFE TO LARGE DEPRESSIONS IN 2X AREAS UPTO 150MM LEVEL DIFFERANCE IN CWAY REQUIRES AROUND 20 TON OF TARMAC MATERIALS. ANY PROBLEMS SEE PHIL  W3W.....CIVIL-SEDATIVE-REKINDLE


 **Note:  Surface dressing and specialist surfacing closures take place on up to 5 separate occasions, with each occasion lasting no longer than 3 consecutive days. Works MAY occur on a weekend. This process is weather dependant and as such exact dates for each location cannot be given

 

 Highway Network Management

Current Roadworks

Last updated: 24 October 2025 14:28:47

Did you find this page helpful?