Current and planned temporary road closures

There are a variety of reasons why a road may need to be closed. This may include safety measures during roadworks, building repairs to a property or holding a community event. Whatever the reason, the road closure requires a legal order or notice and the procedures and requirements for closing a road must be strictly adhered to.

Below are current and planned temporary road closures for the week ahead. This list will be updated at the end of each week  *** Unplanned closures may not appear on the list straight away due to the nature of how we are informed of these ***

If you require any further information regarding a planned or unplanned closure please contact us at Network.Management@doncaster.gov.uk

Further information and details of diversion routes including other road works can also be found at https://one.network/tm

Street Locality Status Start Date End Date Activity Reference Description
Ashton Lane BRAITHWELL Proposed 30/06/2025 30/06/2025 TZ009ACTW-BRM-016-110 Undertake test rod & rope & install sub duct into existing fibre infrastructure as part of the larger fibre to home scheme.  No excavation to be undertaken.
Ashton Lane BRAITHWELL Proposed 30/06/2025 30/06/2025 TZ009ACT-BRAM-WP1-379 Access telecoms chamber to desilt and to undertake test rod & rope & install sub duct into existing fibre infrastructure as part of the larger fibre to home scheme.  No excavation to be undertaken
Balby Road BALBY Proposed 03/07/2025 04/07/2025 DQ015S60 Road Closure required for Pricipal Bridge Inspection
Barnstone Street Back Road East HEXTHORPE Proposed 06/06/2025 31/07/2025 DQ003SYS-BRBRE SCAFFOLD ACCESS TO EACH GABLE ON 1 BARNSTONE ST,DN4 0ES TO ALLOW THE ROOF WORKS AND EWI WORKS FOR
WATES LTD WHO ARE CARRYING OUT ST LEGER HOMES UPGRADES 
Bridleway No 14 Owston OWSTON In Progress 27/05/2025 15/08/2025 DQ015S41 BRIDLEWAY NO 14 OWSTON - PLANE AND RESURFACE PROW
Carr Side Lane HATFIELD Proposed 11/07/2025 11/07/2025 BC008WG6TCG6JSB Road Closure required for the safe access of laying duct, pole testing of DP252 CP00 and tree cutting. Excavation is required in soft verge and TM will be used to provide safe working area throughout.
Church Street THORNE Proposed 01/07/2025 03/07/2025 QA232U19047976 New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes and 5m trench in footway
Common Lane ALMHOLME Proposed 25/06/2025 27/06/2025 QB080284233800140 renew washout hydrant & chamber
Cowper Road MEXBOROUGH In Progress 24/06/2025 30/06/2025 QB080289111940040 Renew leaking water supply pipe
Doncaster Road PICKBURN Proposed 28/06/2025 29/06/2025 QA316YC14947G Overhead Replacement - Replacement of overhead conductor to reinforce network - Traffic Management only (Road closure)

works in conjunction with QA316YC14947F
Fairfield Road OFF YORK ROAD In Progress 02/06/2025 20/07/2025 DQ003FR-278 S278 - Reconstruction of a bell mouth into site, carriageway re-construction and footway remedials
Fenwick Lane FENWICK Proposed 08/07/2025 09/07/2025 KL665NWR25-078-ECML Level crossing test. Working times 23:00 - 05:00
High Street BARNBY DUN In Progress 23/06/2025 12/09/2025 DQ015S66 TOP ROAD /  STATION ROAD / HIGH STREET BARNBY DUN - TRAFFIC SIGNAL SCHEME
Joan Croft Lane HOLME Proposed 28/06/2025 29/06/2025 KL660THORPELX-07062025 Highway works to support the Level crossing upgrade. Hours of work 20:00 - 14:00.
Joan Croft Lane HOLME Proposed 01/07/2025 02/07/2025 KL660THORPELX-280625 Decommission existing level crossing, and upgrade with new infrastructure. Hours of work 20:00 - 08:00.
Kirton Lane THORNE Proposed 29/06/2025 29/06/2025 KL665NWR25-063-ECML DRAINAGE MAINTENANCE. Working times  00:05 - 08:30
Lings Lane HATFIELD Proposed 02/07/2025 03/07/2025 DQ017S94 STREET LIGHTING REPLACEMENT SCHEME
PROVIDE AND INSTALL 6M STREET LIGHTING & TYPE A LANTERN AS PER ISSUED DRAWINGS
INCLUDING NEW CONNECTIONS BY INDEPENDANCT CONNECTION PROVIDER
Lords Head Lane WARMSWORTH In Progress 21/03/2025 19/12/2025 DQ02028006 HEAVY DUTY HGV WAGONS RUNNING THROUGHOUT THE DAY IMPORTING SPOIL TO THE GLEESON HOMES
RESIDENTIAL DEVELOPMENT.
Moss Road ASKERN Proposed 02/07/2025 03/07/2025 KL665NWR25-093-ECML RENEW LC SURFACE AT ASKERN LC. Working times 20:45 - 05:40
Moss Road MOSS Proposed 07/07/2025 08/07/2025 KL665NWR25-080-ECML Level crossing test. 23:00 - 05:00
New Close Lane SKELBROOKE Proposed 08/07/2025 08/07/2025 BC008WG7FCV2RSB ROAD CLOSURE REQURIED FOR THE SAFETY OF ENGINEERS TO CARRYOUT DIG WORKS. Excavation required. TM to provide safe working area throughout.
Norton Common Road NORTON Proposed 30/06/2025 01/07/2025 KL665NWR25-067-ECMLA On track plant to consolidate ballast to improve track quality. Working times 20:45 - 05:00
Old Doncaster Road DENABY MAIN Proposed 30/06/2025 04/07/2025 QB20070246247-JM To excavate in carriageway 1.8m to repair damaged sewer
Pastures Lane CADEBY Proposed 08/07/2025 09/07/2025 TZ009ACTH-CONIS-141 Undertake test rod & rope & install sub duct into existing fibre infrastructure as part of the larger fibre to home scheme.  No excavation to be undertaken.
Pastures Lane CADEBY Proposed 08/07/2025 09/07/2025 TZ009ACTH-CON-140 Undertake test rod & rope & install sub duct into existing fibre infrastructure as part of the larger fibre to home scheme.  No excavation to be undertaken.
Rectory Lane FINNINGLEY Proposed 07/07/2025 09/07/2025 AD03265486884/1 remedial work
Rotherham Road TICKHILL Proposed 01/07/2025 02/07/2025 KL610HAC2-010725 Bridge inspection. Pedestrian marshalling in operation. Hours of work 09:00 - 17:00 daily.
Rushy Moor Road HAYWOOD Proposed 28/05/2025 25/06/2025 DQ015G-HWAY-00812129 SURFACE DRESSING WORKS ON OCCASIONS BETWEEN THE ABOVE DATES AS SIGNED ON SITE
Selby Road ASKERN Proposed 28/06/2025 29/06/2025 KL667ASHDIEBACK/108295 Arboricultural works on declining Ash trees that pose a threat to the public/rail safety.  Hours of works 22:00-10:00.
Pedestrian Marshalling in operation.
Station Road ASKERN Proposed 30/06/2025 01/07/2025 KL665NWR25-132-ECMLA Rail defect discovered through LC. Lorry with Hiab required to deliver and install new rail from the LC to NWR standards. Pedestrian marshalling in operation. Hours of work 21:00 - 06:00.
Station Road ASKERN Proposed 02/07/2025 03/07/2025 KL665NWR25-093-ECMLA RENEW LC SURFACE AT ASKERN LC. Working times 20:45 - 05:40
Station Road FINNINGLEY Proposed 02/07/2025 03/07/2025 KL665NWR25-059-ECML Reliability centred maintenance inspection. Hours of work 22:50 - 05:20.
Station Road FINNINGLEY Proposed 03/07/2025 04/07/2025 KL665NWR25-061-ECML Level crossing test. Working times 23:00 - 05:00
Storrs Lane OWSTON Proposed 01/07/2025 02/07/2025 KL665NWR25-166-ECML Using on track machinery to consolidate ballast to improve track quality and remove cyclic top site that if not treated will lead to an emergency speed restriction and potential of derailment. Hours of works 20:45-05:00.
Fault number-977696
Storrs Lane OWSTON Proposed 07/07/2025 07/07/2025 KL664NWR25-079-ECML LEVEL CROSSING TEST. Working times 08:30 - 14:30
Ten Pound Walk LAKESIDE In Progress 23/06/2025 01/07/2025 AZ1061001437344 Trace, then excavate to repair gas escape and reinstate where possible
Vaughan Avenue   In Progress 27/06/2025 17/07/2025 QA212YP30721 Low Voltage Cable Overlay - Excavate and locate cable, joint new cable, and reinstate excavations, including 30m of trench in footway, 85m of trench in carriageway carriageway and 5m road crossing to replace existing cable to improve quality of supply.
White Rose Way BALBY Proposed 07/07/2025 08/07/2025 FN41227954927 Bridge Joint Repairs
Wroot Road C218 FINNINGLEY Proposed 02/07/2025 03/07/2025 KL665NWR25062ECML Level crossing test. Working times 23:00 - 05:00


 **Note:  Surface dressing and specialist surfacing closures take place on up to 5 separate occasions, with each occasion lasting no longer than 3 consecutive days. Works MAY occur on a weekend. This process is weather dependant and as such exact dates for each location cannot be given

 

 Highway Network Management

Current Roadworks

Last updated: 27 June 2025 13:54:59